During the installation process, the die casting mold must conform to the technical specifications of die casting machine. The person in charge should accurately select the installation size and give full play to the production capacity of die casting machine.


The installation process should be standardized and universal as much as possible to shorten the installation time and facilitate management. The specific precautions for installing die casting mold are as follows:


1. The installation position of the die casting mold should meet the design requirements, and the distance between the center of the expansion force of the die casting machine and the die casting machine should be reduced as much as possible, so that the die casting machine is more stressed.


2. Before installing the mold, completely cleaning machine the installation surface and the die casting mold installation surface. Check whether the length of ejector rod used is appropriate, whether the length of all ejector rod is the same, and the number of ejector rod used is not less than four, and placed in the specified ejector rod holes.


Zn log ar jạruṛ gạḍi jạruṛ gạkhi kạmi lạgit̕ jạruṛ gạkhi kạmi lạgit̕ jạruṛ ge kạmi lạgit̕ jạruṛ gạkhi kạmi lạgit̕ lạgit̕ lạgit̕ jạruṛ ge kạmi lạgit̕ lạgit̕ lạgit̕ lạgit́ lạgit́ lạgit̕ lạgit̕ lạgit̕ lạgit̕ lạgit̕ lạgit̕ lạgit́ lạgit̕ lạgit̕ lạgit̕ lạgit̕ lạgit̕ lạgit̕ lạgit́ ᱟᱨ . . . .


Znd vario ar vs var 25.0 ᱠᱷᱚᱱ } } } offiodiogion ᱫᱚ ᱡᱟᱦᱟᱱ ᱡᱤᱱᱤᱥ ᱠᱷᱚᱱ ᱟᱞᱜᱟ ᱛᱮ ᱵᱟᱝ ᱵᱚᱫᱚᱞ ᱫᱟᱲᱮᱭᱟᱜ-ᱟ ᱾


{ } } } } 10 kg kạmi lạgit̕ kạmi lạgit̕ kạmi lạgit̕ kạmi lạgit̕ kạmi, ᱡᱟᱦᱟᱸ ᱫᱚ extion oft oft oft ar jạruṛa kạmi ko kạmi kana kạmi kana.org ᱦᱩᱭᱩᱜ-ᱟ ᱟᱨ ᱱᱚᱶᱟ ᱫᱚ ᱟᱹᱰᱤ ᱡᱟᱹᱨᱩᱲ ᱜᱮᱭᱟ᱾


6. After the installation is completed, the die casting mold should be properly adjusted, such as fast injection speed, injection pressure, supercharging pressure, slow injection stroke, fast injection stroke, punch follow-up distance, ejector stroke, and launch reset time, etc.


7. Before actual production, the integrity of die casting mold must be confirmed. The mold with neutrons correctly connects the neutron tube and the control switch circuit, confirms that the conductive part of the metal is not exposed, and selects the control program to operate.


8. In daily production, check whether the die casting mold bolts, screw holes and other equipment are in good condition to ensure the personnel, equipment and mold in the production process. The person in charge should also regularly check the stress error of the die casting mold and adjust it when necessary.

601

ᱤᱱᱴᱮᱜᱽᱨᱮᱥᱚᱱ
ᱥᱟᱭᱠᱤᱭᱟᱴᱨᱤᱠ
ᱵᱟᱹᱲᱛᱤ ᱵᱟᱰᱟᱭ ᱥᱟᱶ
  • ᱥᱴᱨᱤᱝ: {}}} |
  • ᱱᱟᱶᱟ: {}} } }᱾
  • ᱤᱢᱮᱞ:sales@die-castingmachine.com
  • ᱱᱚᱴᱥ: ᱭᱟᱝ, ᱭᱟᱝ, ᱭᱟᱝ, ᱭᱟᱝ, ᱭᱟᱝ, ᱱᱭᱩ ᱭᱚᱨᱠ, ᱭᱟᱝ (᱑᱙᱗᱔) ᱥᱯᱤᱨᱤᱴ, ᱟᱨᱴ ᱟᱨᱴ ᱟᱨᱴ ᱟᱨᱴ ᱟᱨᱴ ᱟᱨᱴ ᱟᱨᱴ ᱟᱨᱴ ᱟᱨ ᱮᱴᱟᱜ ᱠᱚ ᱾